2045 E. Highway 380, Suite 100
Decatur, TX 76234 (940)626-0022
Current Projects

Tarrant County Hwy SH 121                      Haltom City, Texas                   $5,300,000.00

Reconstruct bridge and channel.  18,388 CY excavation, 287 CY embankment, 1,697 SY soil retention, 2,260 SF temporary spillway shoring, 4,802 LF soil nail anchors, drill shafts, retaining wall, bridge sidewalk, beams, rip rap and RC pipe.  


cache/wst.opf.4814603.xml
Pecos County Hwy IH 10 Fort Stockton, Texas $23,135,091.59

RCC paving 600,000 SFT, curb and gutter 25,000 LFT, buildings 11,000 SFT each, sidewalks 50,000 SFT, and embankment 100,000 CYDS.


Website Builder