Current Projects

Tarrant County Hwy SH 121 Haltom City, Texas $5,700,000.00

Reconstruct bridge and channel.  18,388 CY excavation, 287 CY embankment, 1,697 SY soil retention, 2,260 SF temporary spillway shoring, 4,802 LF soil nail anchors, drill shafts, retaining wall, bridge sidewalk, beams, rip rap and RC pipe.   

Pecos County Hwy IH 10 Fort Stockton, Texas $23,135,091.59

Two rest areas. Paving, drainage, asphalt, drill shafts, seed/compost, detour asphalt, barrier wall, guard rail, striping, signage. Electric, plumbing, masonry, metals/roof, concrete building, carpentry, and glass/glazing, playgrounds and landscape.

Erosion Control 2105, 2109, & 2113 Briarcreek Lane Plano, Texas $729,973.99

Erosion control improvements along the creek bank behind 2105, 2109, and 2113 Briarcreek Lane and the replacement of the existing sanitary sewer aerial crossing behind 2113 Briarcreek Lane.

Ector County Highway IH 20 Odessa, Texas $1,932,676.56

Bridge repair. Temporary spillway shoring, rip rap, crash wall, rail foundation, concrete wall, concrete repair vertical, and concrete beam repair.

Denton County Levee improvements district No. 1; Denton creek bypass channel repair project $272,258

Repairing approximately .6 acres of eroded slope along the Denton creek flood control channel. Rock filter dam, coffer dam, rock rip rap, and channel excavation.

TxDOT Howard County Highway US 87 Big Spring, Texas $6,661,050

Bridge rehabilitation.  Concrete pedestal, reinforced concrete slab, bridge median, bridge sidewalk, approach slab, silicone resin paint finish, concrete repair vertical & overhead, concrete remove and replace back wall, steel bridge, shear connector steel, clean and paint exist system, rail, retrofit rail, sealed expansion joint, electric conductor, and ground box.  

TxDOT Midland County Highway IH 20 Midland, Texas $944,367.23

Utility bank bore.  Blading, trench excavation protection, jack bore/tune pipe, PTB, crash cush, and ground box.